8 years ago
Friday, May 5, 2017
What tests are conducted on Wind Turbine Blades
Wednesday, May 3, 2017
Tuesday, May 2, 2017
Monday, May 1, 2017
Torque ranges required in the Wind Turbine Sector
Sunday, April 30, 2017
Wednesday, April 6, 2016
Why killing wind energy sector of India?
Windfarms don't produce niceties for politicians and bureaucracy like solar, the most promising renewable source is being systematically killed.
Glimpses:-
Solar will have "achhe din" was anticipated, but Wind will have such "Bure Din" was not thought of.
Glimpses:-
- Lowering of tariff from 5.82 to 4.78 by MP.
- Holding commissioning certificates in Maharashtra.
- Not signing advance PPAs. in MP
- Plugging out windfarms in TN.
Solar will have "achhe din" was anticipated, but Wind will have such "Bure Din" was not thought of.
Sunday, April 3, 2016
Sunday, February 21, 2016
Latest in Wind Energy
1. Global Wind Capacity is now more than nuclear:- Yes, despite all govt support to nuclear and despite 'big science' tag and all dubious secrecy to nuclear, wind has taken over. Global wind capacity= 430 GW, nuclear = 380 GW. :-)
2. German major Senvion is coming to India: country’s target to commission 60GW wind projects by 2022. Its impact on the domestic market will be limited initially as the existing Indian wind market favours those makers who operate as a vertically integrated business – selling land, permitting and O&M together with the turbine — which Senvion does not do in India at the moment,”
3. 92 Gamesa Turbines to come up:- S class 2 MW turbines manufactured in India only will soon be installed in AP and Karnataka sites.
2. German major Senvion is coming to India: country’s target to commission 60GW wind projects by 2022. Its impact on the domestic market will be limited initially as the existing Indian wind market favours those makers who operate as a vertically integrated business – selling land, permitting and O&M together with the turbine — which Senvion does not do in India at the moment,”
3. 92 Gamesa Turbines to come up:- S class 2 MW turbines manufactured in India only will soon be installed in AP and Karnataka sites.
Monday, November 16, 2015
Saturday, November 14, 2015
Save Water, Invest in Wind Energy
WATER CONSUMPTION--CONVENTIONAL POWER PLANTS
Technology gallons/kWh liters/kWh
Nuclear 0.62 2.30
Coal 0.49 1.90
Oil 0.43 1.60
Combined Cycle 0.25 0.95
Small amounts of water are used to clean wind turbine rotor blades in arid climates (where rainfall does not keep the blades clean). The purpose of blade cleaning is to eliminate dust and insect buildup, which otherwise deforms the shape of the airfoil and degrades performance.
Similarly, small amounts of water are used to clean photovoltaics (solar) panels. Water use numbers for these two technologies are as follows:
WATER CONSUMPTION--WIND AND SOLAR
Technology gallons/kWh liters/kWh
Wind [1] 0.001 0.004
Solar [2] 0.030 0.110
Wind therefore uses less than 1/600 as much water per unit of electricity produced as does nuclear, and approximately 1/500 as much as coal.
NOTES
[1] American Wind Energy Association estimate, based on data obtained in personal communication with Brian Roach, Fluidyne Corp., December 13, 1996. Assumes 250-kW turbine operating at .25 capacity factor, with blades washed four times annually.
[2] Meridian Corp., "Energy System Emissions and Materials Requirements," U.S. Department of Energy, Washington, DC. 1989, p. 23.
Technology gallons/kWh liters/kWh
Nuclear 0.62 2.30
Coal 0.49 1.90
Oil 0.43 1.60
Combined Cycle 0.25 0.95
Small amounts of water are used to clean wind turbine rotor blades in arid climates (where rainfall does not keep the blades clean). The purpose of blade cleaning is to eliminate dust and insect buildup, which otherwise deforms the shape of the airfoil and degrades performance.
Similarly, small amounts of water are used to clean photovoltaics (solar) panels. Water use numbers for these two technologies are as follows:
WATER CONSUMPTION--WIND AND SOLAR
Technology gallons/kWh liters/kWh
Wind [1] 0.001 0.004
Solar [2] 0.030 0.110
Wind therefore uses less than 1/600 as much water per unit of electricity produced as does nuclear, and approximately 1/500 as much as coal.
NOTES
[1] American Wind Energy Association estimate, based on data obtained in personal communication with Brian Roach, Fluidyne Corp., December 13, 1996. Assumes 250-kW turbine operating at .25 capacity factor, with blades washed four times annually.
[2] Meridian Corp., "Energy System Emissions and Materials Requirements," U.S. Department of Energy, Washington, DC. 1989, p. 23.
Tuesday, April 14, 2015
Small wind turbine-Specifications
Some body may comment pl if they are still working
Sunday, March 1, 2015
Thursday, January 22, 2015
Draft Mission Document for Wind Energy
GOI ( MNRE ) has prepared a draft of mission Wind Power !
Following are the plans:-
- Generate capacity of 100 Gw of wind power by 2022.( Presently than 20 GW).
This will be an investment of over Rs 10 lakh crore. - The potential is estimated at 300 Gw.
- Extend the ‘generation based incentive for project developers for five years.( Will cosr Rs 18,000 Crore)
- This ‘wind energy mission’ will be a part of the National Action Plan for Climate Change (NAPPC).
- Finance minister Arun Jaitley is likely to announce a slew measures in his budget including a 10-year tax holiday for wind power producers, concessions in customs duty and exemption in excise duty for procurement of technology and equipment for projects.
- Budget may also announce a ‘National Offshore Wind Energy Policy’ extending further fiscal sops in the form of exemption from service tax for services like conducting wind resource assessment, environment impact assessment (EIA), oceanographic study, utilisation of survey vessels and installation of vessels for these projects.
- The Budget 2013-14 gave a set of incentives for the wind sector. It reinstated generation-based incentive (GBI) that had resulted in the growth of the sector in the past. An incentive of 50 paise is provided for every unit of electricity generated under the GBI scheme.
- The government, also reinstated accelerated depreciation (AD) for wind sector last year. The AD scheme allowed investors to write down up to 80 per cent of the project cost as depreciation when calculating taxable profits.
- The withdrawal of AD and GBI schemes in 2012 had for wind energy projects led to fall in capacity addition with a mere addition of 1,800 MW new capacity in 2012-13 as against 3,000 MW in 2011-12.
- About 7000 MW of offshore wind capacity has already been installed around the world and around the same capacity is under construction.
Monday, December 22, 2014
Tallest Wind Tubine of World in India?
Wednesday, January 8, 2014
Wednesday, July 10, 2013
Parameters of wind turbines which affect annual energy output (AEO)
Rated Output Power (ROP):-
rotor diameter changes the ROP.
RPM :- larger dia reduces rotor RPM.
Capacity Factor ( CF):- higher capacity factor means higher AEO, but practically CF never goes beyond 40
Q) Does wind speed affect AEO?
Surprisingly the answer is NO !
This is because AEO is calculated upon average wind speed, which is already accounted for in CF.
Maximum Tip Speed that can be obtained is 70-80 m/s.
Cut in wind speed for most of the turbines is 5 m/s and cut out is 25 m/s
O & M costs can be taken as 8 % of annual gross revenue.
rotor diameter changes the ROP.
RPM :- larger dia reduces rotor RPM.
Capacity Factor ( CF):- higher capacity factor means higher AEO, but practically CF never goes beyond 40
Q) Does wind speed affect AEO?
Surprisingly the answer is NO !
This is because AEO is calculated upon average wind speed, which is already accounted for in CF.
Maximum Tip Speed that can be obtained is 70-80 m/s.
Cut in wind speed for most of the turbines is 5 m/s and cut out is 25 m/s
O & M costs can be taken as 8 % of annual gross revenue.
Thursday, May 16, 2013
Subscribe to:
Posts (Atom)