Its all about windenergy. The ultimate answer to the future energy needs of the world.
join me on fb @ indiwindy@gmail.com
Friday, May 5, 2017
Nacelle of ReGen 2 MW wind turbine
ReGen India is partner with Vensys Germany and above turbine is their amazing product on same 1.5MW platform. Its rotor dia is 116m. and is designed for power density of 189W/sqm. Its gearless. Deploys Variable speed Synch Gen with PM excitation.
The era of exponential growth is over in India. Same we see in the table below, Well, the fact is after withdrawal of AD ( Acc...
The Wind Ahead..
Indian wind energy installed capacity likely to cross 30,000MW by 2030 , enough to produce 350TWh electricity ( 15% of energy need).This will mean an annual investment of Rs.300billion and creation of 1,50,000 jobs alongwith 320mT/year CO2 saving.
GWEC production is 100 GW.
ABB has set up WTG plant with Rs.200 Crore.
300MW wind energy gets GBI ( $0.01 /uniot for 4 to 10 years) with cap of $1,40,000 /year. MNRE has investment $81 million for this.
Accelerated depreciation of capital investemnt againts tax will continue till 2012.
Either GBI can be claimed or above, but not both.
India needs GBI of INR 1 ( $0.02) / unit .
MNRE expects 600 MW registration for GBI by March 2011.
Top 5:- US(40,000 MW), China(30,000MW),Ger(28,000MW),Spain(20,000MW) and India(12,000MW)
No comments:
Post a Comment