join me on fb @ indiwindy@gmail.com
Showing posts with label Wind Turbines. Show all posts
Showing posts with label Wind Turbines. Show all posts

Saturday, July 26, 2008

How to overcome Gearbox Problem

Gearbox is the most difficult item in the supply chain of wind turbines. Larger the gearbox, more is the problem.

Suzlon has some inhouse capacity, but thats not enough. Lets solve this problem by 5 point plan:-

1. Declrare incentives for gearbox manufacturers.

2.Setting up a tech mission roping in IITs to suggest design changes to imrove reliability.

3.Make import duty free.

4.Allow free transportation to reduce landing cost.