Tuesday, October 9, 2012

Barrier Analysis for Wind Energy Project

High Capital Cost ( IRR 13 %)

Less Utilisation Factor ( 15 %)

Power Purchase Tariff  Barrier ( Rs 3 per Unit)

Technological Barrier

Not prevailing practice barrier.

Wind Speed Barrier

Institutional Barrier

Tuesday, June 12, 2012

More Wow ! to Indian Wind Energy Sector

While Vestas is partying after order of 20 turbines ( 1.65 MW ) from Orient Green for Tmilnadu windfarm, Asian Development Bank ( ADB )+NTPC+Kyushu have formed JV to produce 10,000 MW wind power in the country.
AMSC has completed the follow on order from INOX. Turbine control system of AMSC will be utilised in 2 MW machines ( manufactured in UNA (HP)).

Sunday, July 27, 2008

Why not make Wind Energy a B -Tech branch in IITs

India is facing acute power crisis. Its going to worsen as fossil fuels get depleted. We have lots of tech issues resolved in the wind power sector, but some still exist. Wind power is growing at a rate of 22% per annum. It needs dedicated techies to work in the industry.
Microsiing, Wind mapping, compnent designing, operation and maintenance, gris connectivity are some of the many subjects that can be in the curriculum.

Wednesday, July 23, 2008

Due Diligence Report

Wind farm is a huge project. Every project that needs financing goes through 'Due Diligence Report'. Its a techno-economical-legal verifiction report. It helps us know:-
1. The overall wind energy market scenario.
2. Economic viabilty of the wind power project.
3.Constraints ans their trend.
4.Analysis of various players
5.Legal aspects
6. Future prospects.
7.Technical details.