join me on fb @ indiwindy@gmail.com

Monday, October 8, 2012

Whats needed in Indian Wind Energy Sector

The rquirements before finalising sites in India are:-

  • Sites are available within radius of 5 Km to 6km from the government mast station.
  • Mean annual Wind speed measured at (20/25/30/50m ) is 5.5 m/s and above
  • Mean annual wind power density at 50m measured between 225 to 250 W/m.
Event:-
Wind Power India 2012 conference, India’s largest and most prestigious wind power conference, November 29-30, 2012, at Chennai Trade Center, Chennai – www.windpowerindia.in. This conference is held in parallel to the Wind Power India exhibition.

No comments: