The rquirements before finalising sites in India are:-
- Sites are available within radius of 5 Km to 6km from the government mast station.
- Mean annual Wind speed measured at (20/25/30/50m ) is 5.5 m/s and above
- Mean annual wind power density at 50m measured between 225 to 250 W/m.
Event:-
Wind Power India 2012 conference, India’s largest and most prestigious wind power conference, November 29-30, 2012, at Chennai Trade Center, Chennai – www.windpowerindia.in. This conference is held in parallel to the Wind Power India exhibition.
No comments:
Post a Comment